Published date: 2 September 2020
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Industry
Construction work - 45000000
North West
£250,000
MERTVL001-DN495257-35276302
2 September 2020
6 October 2020
11am
20 November 2020
19 May 2021
Works
Open procedure
What is an open procedure?
Yes
No
These works have been broken down into 4 different work packages, they include: -
Package 1- Kingsway Box Sewer Works
• Undertake localised concrete repairs to the covered approaches (where necessary).
• Mortar repair to brickwork
• Removal of vegetation growth from the structure.
• Cleaning and repainting of the protective paint coating to the surface of the Gatic cover beams.
Package 2- Covered Approaches - Repairs
• Undertake localised concrete repairs to the covered approaches (where necessary).
• Remove of vegetation growth from the structure.
• The raking out and replacement of the expansion joint sealant.
• The further investigation of the water ingress at vent shaft VS11 in the Liverpool Covered Approach.
• Remove all temporary access systems and support structures and make good the existing structure.
Package 3- Covered Approaches- Painting
• Undertake localised cleaning of all concrete members via hand scraping and
• pressure washing to remove existing anti-carbonation coating.
• Painting of new anti-carbonation coating to covered approaches.
Package 4- Retaining Walls and Overbridges
• Extension of outfall pipes.
• Replace missing bolt to infill mesh.
• Replacement of a failed manhole.
• Make safe exposed electrical cables.
• Re-bed dislodged copings.
Contact name
Procurement Team
1 Mann Island
Liverpool
L3 1BP
United Kingdom