Mechanical Sweeper, Road Sweeper Hire, Bond Coat Spraying, Joint Sealant Services, Road Marking Services
London PropTech Show 2026

Search results for Private Wire Connection

Search results in Tenders

  • Supply and Installation of a Ground Based Solar PV System, Private Wire Connection and Maintenance Services to the Elstow Closed Landfill Site, Bedford
  • Creag Riabhach Windfarm Connection. Supply & Construct the electricity power line between the windfarm and transmission substation.
  • To design and construct a communal soakaway to serve 17 residential properties. The work will include connection to the existing drainage network. The new soakaway will be required to cross under a residential dwelling.
  • Rochdale Borough Council (RBC) on behalf of Rochdale Development Agency (RDA) are tendering for a Contractor who is required to carry out the design, engineering, procurement, construction, testing, commissioning and handover of the Chamber House Solar Farm (the Solar Farm, or Project) and then operate and maintain the system until Completion. This project forms part of the wider Unlocking Clean Energy in Greater Manchester (UCEGM) European Regional Development Funded (ERDF) project and as such is part grant funded by ERDF The Solar Farm shall have a 30-year design life and shall generate and export power to the Point of Supply (PoS) defined in the grid connection offer provided by Electricity North West (ENW, or the Distribution Network Operator (DNO)).
  • DELETTI (DEvon Low carbon Energy and Transport Technology Innovator) is a European Regional Development Fund (ERDF) part-funded programme that aims to continue the low carbon transport and energy transformation, through the expansion of electric vehicle charge points (EVCPs), solar carports and developing new, local energy models. This is the procurement for phase 2 of the DELETTI charge points project. The capital costs of Phase 2 are funded by the UK government’s the On-street Residential Charge point Scheme (ORCS).
  • The Council's aim is to ensure that present and future residents of the Borough have greater choice in being able to live in a home that is affordable, in good condition and adequately meets their needs. The Council is keen to ensure that it has excellent future proof services, where possible, which meet these needs.
  • Scope of the procurement - Tether electrical assembly 1,2MW. Assembly connectors to cables
  • Minesto requires the design and fabrication for a containerised test rig - Fabrication work
  • The works include the removal of the existing sanitary provisions, the removal of the floor tiles and breaking out of the screed (depth unknown). The replacement of the floor screed, with reinforcement, and retile, subdivision of the female facilities to provide a Part M compliant cubical including new blockwork wall and ramped access and forming of new door to serve the altered female facilities.
  • Scope of the procurement: Wet Mate Connectors, Parts of electric motors, generators and transformers, Cable and related products, Submarine cable
  • Supply of vacuum insulated tubing (VIT) and ancillaries for a coaxial circulation system in the first deep geothermal well at the Eden Project, Cornwall PL24 2SG, UK
  • Michelin Scotland Innovation Parc is seeking to procure a specialist company to design, build, commission, maintain and operate a Hydrogen Refuelling Station on the Parc, to generate and supply green hydrogen for a minimum of 12 hydrogen fuel cell electric buses and any additional clients within the period of the contract and to provide a capital contribution for the installation and operations to enable hydrogen supply by early 2022
  • Type of contract: Works. outhside district situated in the heart of Chinatown attracts visitors and tourists to the city centre and is one of the most diverse and creative areas of Birmingham. It lies within the boundary of the City Centre Economic Zone (EZ). The Council wishes to establish a contract to carry out work to Southside Public Realm.
  • MCS Control Container - Main CPV code 31200000 Electricity distribution and control apparatus
  • The City of Edinburgh Council is seeking to appoint a suitably qualified Development Partner for the delivery of a major mixed use scheme on a 3-hectare site at Fountainbridge. The development requirements for the site comprise of at least 436 homes and a separate office building. The proposals also include retail and commercial space which could be used for a variety of purposes. It is expected that the Development Partner would construct approximately 177 affordable homes, with ground floor retail for the Council, while the office space, remaining residential units, and ground floor retail/commercial space would represent a development opportunity.
  • This tender is for the collection of wave characterisation data at Pevensey Bay, Sussex. The mixed, shingle barrier beach at Pevensey Bay, Sussex, represents a crucial asset in flood defence and coastal risk management along the East Sussex coastline. The 9 km frontage is highly dynamic, and suffers a net loss of sediment due to littoral drift, partly blocked by the Sovereign Harbour breakwaters. The spatial and temporal variations in beach volume, erosion and rollback remain poorly understood, and interventions to redistribute beach material are continuous.
  • Responsive Maintenance and Void Property Works with Planned Maintenance and Communal Mechanical and Electrical Works (Registration Code: CLANREP1)
  • The framework agreement covers the provision of comprehensive and innovative waste solutions and suppliers will be expected to proactively assist in attempts to reduce the quantities of waste sent to landfill and achieve recycling targets. This is in line with the revised Waste (England and Wales) Regulations 2011 that prioritise the waste hierarchy.
  • Maintenance Tender including Responsive Repairs & Voids, 3 Star Gas Servicing and Electrical Testing 2021-2024
  • For the provision of mobile inspection vehicles, skilled operators, all surveying equipment, systems and production of reports and provision of recommendations or guidance in relation to surveys undertaken. This will provide support to the in-house Sewer Asset Survey teams.
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif