BuildTech Week 2026
London Build 2026

Search results for products to construction

Search results in Tenders

  • Appointment of a Project Manager led Integrated Consultant Team for the delivery of the new Greenisland PS, Carrickfergus. Approximate services value £325k-375k. The Integrated Consultant Team to provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, provision of architectural, quantity surveying, structural, services engineering, civil and structural services for delivery of the proposed School Enhancement Programme (SEP) project.
  • This contract award notices relates to 'Lot 1: Employers Agent Services' of the Torus Development Consultants Framework only.
  • TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. TWUL recognises these as infrastructure – nominally the underground network of water mains and sewage and non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region.
  • Dynamic Purchasing System (DPS) for the provision of Adaptations, Repair, Maintenance and Improvement (ARMI) for Contracting Authorities and grant applicants.
  • Design, Development, Delivery and Operation of Extra Care Housing on Sites at Gosport, New Milton and Petersfield
  • Following a procurement exercises Hackney Council has awarded a contract for the provision of Highways Maintenance, covering improvement of footways, carriageways, street lighting and other associated highways maintenance works. These works will enable the successful delivery of the capital improvement programme, reactive maintenance works and other associated works, carried out under a Measured Term Contract.
  • DPS for the Provision of Conversion, Refurbishment and Specialist Minor Works
  • Type of contract: Works. outhside district situated in the heart of Chinatown attracts visitors and tourists to the city centre and is one of the most diverse and creative areas of Birmingham. It lies within the boundary of the City Centre Economic Zone (EZ). The Council wishes to establish a contract to carry out work to Southside Public Realm.
  • Our multidisciplinary technical services framework will be used to procure development related professional and technical services on our land. The services procured through this framework will be linked to preparation of public sector sites for disposals to developers in order to build homes.
  • The City of Edinburgh Council is seeking to appoint a suitably qualified Development Partner for the delivery of a major mixed use scheme on a 3-hectare site at Fountainbridge. The development requirements for the site comprise of at least 436 homes and a separate office building. The proposals also include retail and commercial space which could be used for a variety of purposes. It is expected that the Development Partner would construct approximately 177 affordable homes, with ground floor retail for the Council, while the office space, remaining residential units, and ground floor retail/commercial space would represent a development opportunity.
  • Supply of Double Glazed Units and Sheet Glass - DPS. Works
  • South Tyneside Council wishes to install a district heating system serving several Council owned buildings in central Hebburn utilising the disused mine workings under Hebburn as a heat source. The installation of such a district heating scheme will reduce the Council’s reliance on gas to provide heating and significantly contribute to the Council’s commitment to its Carbon Reduction targets, and this scheme alone will provide a saving of 319 tonnes/year saving. A separate contract has been awarded to undertake the drilling of two boreholes, and the construction of permanent abstraction and re-injection wells. The water source heat pump adopted in this project will be able to source heat from both the mine water as well as ambient air (via dry air cooler) in the event that the mines are found to be unable to provide a sustainable mine water heat source.
  • Installation of ducting and foundation works for electric vehicle charge points
  • The proposed works covered under the Highways Capital Improvement Projects Term Contract typically but not exhaustively include: New kerbing and footway works; Carriageway realignment, reconstruction, planing and surfacing works; Junction improvement works; Traffic Signal Junctions and Controlled Crossings (Puffin, Toucan and Pegasus); Installation of Bus Stops and pedestrian crossing point to DDA standards; Provisions for cycling; Installation of street furniture; Traffic calming features. Site-specific details will be issued with the individual works packages.
  • CA7674 - Tower Block Ground Floor Toilets, Southend University Hospital NHS Foundation Trust
  • The scope of works will entail building new stabling roads. This will require additional track, new Switch and Crossings (S&C) units, platforms, walkways, lighting, communications and signalling.
  • The requirement is to undertake various works to the existing school at Mount Pleasant Road. These shall include repairs to the existing clock tower and the replacement of perimeter fencing and gates; all as more specifically described within the tender documents.
  • To design and construct a communal soakaway to serve 17 residential properties. The work will include connection to the existing drainage network. The new soakaway will be required to cross under a residential dwelling.
  • Carmarthen, For the exhibition and fit out works to the Museum of Land Speed in Pendine, to include reception and shop. The exhibition works include furniture items, setworks, showcases, plinths, graphic production, AV hardware, AV software (one exhibit), manual and digital interactives, models, electrics and lighting.
  • University procured a Consultant to assist with the relocation of the Plymouth Business School (PBS) from its existing off-campus location in the Cookworthy Building to a more prominent location on the main campus. All Suppliers invited to this opportunity have passed the minimum requirements of the Procurement hub's Consultants OJEU Reference Number 2019/S 130-319565.
/images/banners/London_Build_2026_250x250.webp