Mechanical Sweeper, Road Sweeper Hire, Bond Coat Spraying, Joint Sealant Services, Road Marking Services
Deko Construction Decoration

Search results for Minor Works

Search results in Tenders

  • North Star are looking for a provider of electrical PIR Testing. A full detailed scope of works can be obtained from our e-procurement portal .
  • Creag Riabhach Windfarm Connection. Supply & Construct the electricity power line between the windfarm and transmission substation.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of the South Breakwater and other ancillary works, inclusive of the recommissioning and operation of the existing on-site accropode manufacturing facility for the manufacture of the final accropodes required for the construction of the South Breakwater.Provision of Insitu concrete shall be free issue by the client.
  • The works include the removal of the existing sanitary provisions, the removal of the floor tiles and breaking out of the screed (depth unknown). The replacement of the floor screed, with reinforcement, and retile, subdivision of the female facilities to provide a Part M compliant cubical including new blockwork wall and ramped access and forming of new door to serve the altered female facilities.
  • The Council is carrying out this procurement process to establish a multi supplier Framework Agreement to provide the supply on an ex works basis
  • The lotting structure for this framework is based on contract value and the works cover a variety of works, including, but not limited to Public realm works, Highways construction works, Highways structure works, Drainage works, Marine / coastal / river works
  • The scope of works will entail building new stabling roads. This will require additional track, new Switch and Crossings (S&C) units, platforms, walkways, lighting, communications and signalling.
  • Project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project.
  • North Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Framework - Instrumentation and control equipment - Pumps - Construction work - Electrical engineering installation works - Mechanical engineering installation works - Repair and maintenance services of pumps
  • The scope of the works is a measured term contract for specialist flooring contractors to supply and installation various floor coverings such as carpet tiles, vinyl sheet coverings including accessories and sealing wood floors at various Council properties and locations.
  • Trunk road construction work, Construction work for bridges, Engineering design services. The Welsh Ministers (WM) have let a contract to design and construct approximately 6.1km of new trunk road to the north of Llanddewi Velfrey and Narberth under the “A40 Llanddewi Velfrey to Redstone Cross Improvements Project”. The scheme will also include a package of Active Travel and De-trunking works to the old A40 carriageway.
  • The Trust has awarded new Civil Engineering Construction Framework Contracts under NEC4 to two National Framework Contracts for undertaking complex civil works, and nine Regional Framework contracts for non-complex civil works.
  • The Council is seeking to appoint a single specialist contractor to deliver mains water excavation repairs. This will include excavations to access burst mains through soft and hard ground, mains water pipe work repairs inside individual properties and communal areas, and mains water pipework re-runs.
  • This contract will provide Freebridge with a turn key roofing supplier for all demands by the business. The Contract will be let on an “all-inclusive” basis incorporating the National Housing Federation Schedule of Rates suite of documentation as set out in the draft Articles of Agreement completed in accordance with the Contract Details included with the Procurement Documents. The contract is none exclusive and there is no guaranteed of supply, the forecast spend is £850,000 per annum.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of a Crown Wall approximately 630m long by 15m high (Varying heights) on top of an existing rouble mound breakwater.
  • The purpose of this Notice is to inform the market of the additional works/services to be performed by UBB Waste (Essex) Limited following a proposed amendment of its contract with ECC for the design, construction, commissioning, operation and handback of a mechanical biological treatment facility in Basildon. The facility did not pass the acceptance tests specified in the contract which led to ECC commencing litigation against the contractor. The Authority has given notice that it is proposing to take a decision to enter into an Agreement to settle that litigation and to amend the handback requirements of the contract such that the site will be returned to ECC in a condition that will allow for its future redevelopment. It is expected that the modified contract will expire in 2040.
  • Type of contract: Works. outhside district situated in the heart of Chinatown attracts visitors and tourists to the city centre and is one of the most diverse and creative areas of Birmingham. It lies within the boundary of the City Centre Economic Zone (EZ). The Council wishes to establish a contract to carry out work to Southside Public Realm.
  • The objective of this contract is the supply, transportation, and construction of stone, timber, plastic, heather bale and natural fibre log dams in gully systems on restoration work sites around the Peak District and South Pennines SAC. It also includes the construction of peat dams, peat bunds and the re-profiling of hag/gully sides.
  • LTE Group are looking to contract a supplier to design and refurbish an existing facility at HMP Wormwood Scrubs and purchase industry standard equipment and tools to reflect real working environments in the community.
  • Responsive Maintenance and Void Property Works with Planned Maintenance and Communal Mechanical and Electrical Works (Registration Code: CLANREP1)
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif