London PropTech Show 2026
London PropTech Show 2026

Search results for Construction work

Search results in Tenders

  • The contracting authority wishes to procure a suitably qualified and competent contractor(s) to provide minor works and services for the Direct Labour Organisation. Full details can be found within the attached tender documents.
  • These works have been broken down into 4 different work packages, they include: - Package 1 - Kingsway Box Sewer Works, Package 2 - Covered Approaches - Repairs, Package 3 - Covered Approaches - Painting, Package 4 - Retaining Walls and Overbridges
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of a Crown Wall approximately 630m long by 15m high (Varying heights) on top of an existing rouble mound breakwater.
  • Proposed development of 22 properties and new vehicle access from Ffordd Coppy, including internal access roads and turning area. (JCT Design and Build Contract 2016).
  • Hull City Council (The Authority) invites qualified and interested suppliers to tender for The Renovation and Refurbishment of the Dock Office Chambers and the Grade II* Hull Maritime Museum.
  • Rochdale Borough Council (RBC) on behalf of Rochdale Development Agency (RDA) are tendering for a Contractor who is required to carry out the design, engineering, procurement, construction, testing, commissioning and handover of the Chamber House Solar Farm (the Solar Farm, or Project) and then operate and maintain the system until Completion. This project forms part of the wider Unlocking Clean Energy in Greater Manchester (UCEGM) European Regional Development Funded (ERDF) project and as such is part grant funded by ERDF The Solar Farm shall have a 30-year design life and shall generate and export power to the Point of Supply (PoS) defined in the grid connection offer provided by Electricity North West (ENW, or the Distribution Network Operator (DNO)).
  • The requirement is to undertake various works to the existing school at Mount Pleasant Road. These shall include repairs to the existing clock tower and the replacement of perimeter fencing and gates; all as more specifically described within the tender documents.
  • To design and construct a communal soakaway to serve 17 residential properties. The work will include connection to the existing drainage network. The new soakaway will be required to cross under a residential dwelling.
  • Project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project.
  • The Enabling Civils Works (Package 2) (ECW2) Contract is to carry out the enabling civils works for HS2 Phase 2a, consisting of the construction of a bridge and associated slip roads across the M6 motorway at Yarnfield Lane, Stone, Staffordshire, together with highways improvements to Yarnfield lane; and off-route road improvement schemes at 20 locations across the line of route that are intended to mitigate the effects of increased traffic numbers during the main HS2 construction works with associated survey works. The Contract included route wide engineering and environmental surveys to inform the design of the railway.
  • West Yorkshire traffic signal maintenance.
  • The City of Edinburgh Council is seeking to appoint a suitably qualified Development Partner for the delivery of a major mixed use scheme on a 3-hectare site at Fountainbridge. The development requirements for the site comprise of at least 436 homes and a separate office building. The proposals also include retail and commercial space which could be used for a variety of purposes. It is expected that the Development Partner would construct approximately 177 affordable homes, with ground floor retail for the Council, while the office space, remaining residential units, and ground floor retail/commercial space would represent a development opportunity.
  • Type of contract: Works. outhside district situated in the heart of Chinatown attracts visitors and tourists to the city centre and is one of the most diverse and creative areas of Birmingham. It lies within the boundary of the City Centre Economic Zone (EZ). The Council wishes to establish a contract to carry out work to Southside Public Realm.
  • The Association has identified or will identify potential development opportunities primarily in Ayrshire and Dumfries & Galloway, to be procured between 2019 and 2023. These developments could involve the construction of up to approximately 800 new residential properties and various commercial/ non-housing projects over the next 4 years
  • Repair and maintenance of fluid and gas filled electricity cable.
  • TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. TWUL recognises these as infrastructure – nominally the underground network of water mains and sewage and non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region.
  • North Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Framework - Instrumentation and control equipment - Pumps - Construction work - Electrical engineering installation works - Mechanical engineering installation works - Repair and maintenance services of pumps
  • Appointment of a Project Manager led Integrated Consultant Team for the delivery of the new Greenisland PS, Carrickfergus. Approximate services value £325k-375k. The Integrated Consultant Team to provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, provision of architectural, quantity surveying, structural, services engineering, civil and structural services for delivery of the proposed School Enhancement Programme (SEP) project.
  • The contract is for the contractor to develop with the Council a high-performing, comprehensive highways service. The contract encompasses highway maintenance, design, construction, transport planning, consultancy with other services including but not limited to vehicle and grounds maintenance.
  • The University is seeking experienced Painting & Decorating Contractors that can provide both expert advice and a high quality service. Works will mainly be at the three campuses - City NG1 4FQ, Clifton NG11 8NS, Brackenhurst NG25 0QF.
/images/banners/proptech_show_250_250.jpg