Waterproofing Solutions
Deko Construction Decoration

Search results for access fabrications

Search results in Tenders

  • Framework for the design, manufacture and installation of structural steelwork, metalwork and permanent access fabrications. To be CE Marked to Execution Class II.
  • Proposed development of 22 properties and new vehicle access from Ffordd Coppy, including internal access roads and turning area. (JCT Design and Build Contract 2016).
  • The Council is seeking to appoint a single specialist contractor to deliver mains water excavation repairs. This will include excavations to access burst mains through soft and hard ground, mains water pipe work repairs inside individual properties and communal areas, and mains water pipework re-runs.
  • Hull City Council (The Authority) invites qualified and interested suppliers to tender for The Renovation and Refurbishment of the Dock Office Chambers and the Grade II* Hull Maritime Museum.
  • SSE is proposing to secure a series of framework agreements to access an itemised list of transactional wind turbine support services. This will potentially cover a number of wind farms in the Republic of Ireland, Northern Ireland and Great Britain. Bidder will be expected to offer for each site and services they are interested in tendering for.
  • Thames Water Utilities Ltd intends to award one or more framework agreements for the provision of security access equipment. This will apply across all Thames Water regions and bidders can apply for one or more lots.
  • Archaeology Scotland wishes to commission a fencer/labourer for the Real Wild West: Adopt-a-Monument (AaM) programme in west Ardnamurchan. This aims to deliver Programme 1: Adopt-a-Monument; Conserving the heritage of west Ardnamurchan (see attached Project Plan). The awardee will complete the installation of fencing and gates around two archaeological sites to improve their preservation and allow better access for the public.
  • The Council wishes to establish a Contract for the demolition of the houses located off Wellhead Lane followed by the remediation of the site. The works comprise general site clearance, removal of asbestos containing materials and demolition of the houses located off Wellhead Lane in Perry Barr, Birmingham.
  • The works include the removal of the existing sanitary provisions, the removal of the floor tiles and breaking out of the screed (depth unknown). The replacement of the floor screed, with reinforcement, and retile, subdivision of the female facilities to provide a Part M compliant cubical including new blockwork wall and ramped access and forming of new door to serve the altered female facilities.
  • Refurbishment of Needham ward in Ipswich Hospital, East Suffolk and North Essex NHS Foundation Trust
  • CA7674 - Tower Block Ground Floor Toilets, Southend University Hospital NHS Foundation Trust
  • The Council's aim is to ensure that present and future residents of the Borough have greater choice in being able to live in a home that is affordable, in good condition and adequately meets their needs. The Council is keen to ensure that it has excellent future proof services, where possible, which meet these needs.
  • The scope of works will entail building new stabling roads. This will require additional track, new Switch and Crossings (S&C) units, platforms, walkways, lighting, communications and signalling.
  • The GP Contract requires that by 2022/23, Lloyd George notes will be digitised and patients will have access to their records. A Dynamic Purchasing System was established in 2020 to ensure that CCGs can award contracts to suitably qualified and experienced suppliers who can deliver against this requirement, whilst keeping the burden to practices to a minimum.
  • Provision of uniformed and trained, unarmed, security guard services to perform routine protective and access control duties for the Delegation of the EU in the United Kingdom located in London.
  • Swansea University is looking to procure a development partner to carry out a further phase of expansion and development works on, or near to, its Bay Campus. The works will comprise the: - construction and delivery of between 20,000 and 30,000 square meters of academic development, and ancillary retail and support facilities located on the Bay Campus; - construction, maintenance and operation of a minimum of six hundred (600) (and a maximum of fifteen hundred (1500)) accommodation units either on, or near to, the Bay Campus; and - potential construction and delivery of additional ancillary student space, welfare facilities and place-making such as (but not limited to) sports or music facilities.
  • The minor highway framework is to support Highways Maintenance Service with minor Civil Engineering projects
  • The Council is carrying out this procurement process to establish a multi supplier Framework Agreement to provide the supply on an ex works basis
  • These works have been broken down into 4 different work packages, they include: - Package 1 - Kingsway Box Sewer Works, Package 2 - Covered Approaches - Repairs, Package 3 - Covered Approaches - Painting, Package 4 - Retaining Walls and Overbridges
  • Carmarthen, For the exhibition and fit out works to the Museum of Land Speed in Pendine, to include reception and shop. The exhibition works include furniture items, setworks, showcases, plinths, graphic production, AV hardware, AV software (one exhibit), manual and digital interactives, models, electrics and lighting.
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif