Waterproofing Solutions
London Build 2026

Search results for ground floor retail

Search results in Tenders

  • CA7674 - Tower Block Ground Floor Toilets, Southend University Hospital NHS Foundation Trust
  • The City of Edinburgh Council is seeking to appoint a suitably qualified Development Partner for the delivery of a major mixed use scheme on a 3-hectare site at Fountainbridge. The development requirements for the site comprise of at least 436 homes and a separate office building. The proposals also include retail and commercial space which could be used for a variety of purposes. It is expected that the Development Partner would construct approximately 177 affordable homes, with ground floor retail for the Council, while the office space, remaining residential units, and ground floor retail/commercial space would represent a development opportunity.
  • ESB is seeking expressions of interest to obtain a place on a qualification system that will be established for EPC companies to: Design, Supply, Install and Maintain all elements of a ground mounted solar development. The projects will be located in Ireland and the UK, and the qualification system may include projects developed by ESB, ESB joint venture companies (existing or yet to be formed), ESB subsidiary companies or companies ESB Group has a minority interest in. ESB plans to develop ground-mounted solar farms commencing in 2019, through a pipeline of planned projects. Applicants should note that the detailed scope and contracting strategy for each project will be determined in any subsequent procurement competition (which may include a further pre-qualification process before the tender phase).
  • The Council wishes to establish a Contract for the demolition of the houses located off Wellhead Lane followed by the remediation of the site. The works comprise general site clearance, removal of asbestos containing materials and demolition of the houses located off Wellhead Lane in Perry Barr, Birmingham.
  • The Council is seeking to appoint a single specialist contractor to deliver mains water excavation repairs. This will include excavations to access burst mains through soft and hard ground, mains water pipe work repairs inside individual properties and communal areas, and mains water pipework re-runs.
  • Swansea University is looking to procure a development partner to carry out a further phase of expansion and development works on, or near to, its Bay Campus. The works will comprise the: - construction and delivery of between 20,000 and 30,000 square meters of academic development, and ancillary retail and support facilities located on the Bay Campus; - construction, maintenance and operation of a minimum of six hundred (600) (and a maximum of fifteen hundred (1500)) accommodation units either on, or near to, the Bay Campus; and - potential construction and delivery of additional ancillary student space, welfare facilities and place-making such as (but not limited to) sports or music facilities.
  • Supply and Installation of a Ground Based Solar PV System, Private Wire Connection and Maintenance Services to the Elstow Closed Landfill Site, Bedford
  • The works include the removal of the existing sanitary provisions, the removal of the floor tiles and breaking out of the screed (depth unknown). The replacement of the floor screed, with reinforcement, and retile, subdivision of the female facilities to provide a Part M compliant cubical including new blockwork wall and ramped access and forming of new door to serve the altered female facilities.
  • The project is for the management, supply and preservation of water across the Lincolnshire County. This project seeks to place instrumentation into water catchments to inform partners what happens to water from when rain hits the ground to when rivers outfall into the sea.
  • ASRA is seeking to appoint a suitably qualified and experienced contractor to enter into a JCT 2016 Design and Build Contract with Quantities with bespoke amendments to undertake the redevelopment of a residential housing project for the redevelopment of 71-75 Westmead Road, comprising a four storey development consisting of 35 apartments.
  • The scope of the works is a measured term contract for specialist flooring contractors to supply and installation various floor coverings such as carpet tiles, vinyl sheet coverings including accessories and sealing wood floors at various Council properties and locations.
  • The design, installation and commissioning of a 3MW ground mounted solar farm at Newcastle International Airport
  • TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. TWUL recognises these as infrastructure – nominally the underground network of water mains and sewage and non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region.
  • PA Housing are going to market for heating servicing, maintenance and installation contracts. The services will include the delivery of provision of a 3 star heating servicing, maintenance and installation service for domestic and a servicing and maintenance service for commercial systems to properties owned and managed by PA Housing.
  • A development agreement (“DA”) was originally entered into in 2010 between the South East England Development Agency (“SEEDA”) and Stanhope PLC and concerned the re-development, in phases, of a site in the centre of Ashford known as Elwick Place according to a masterplan to be agreed between the parties. In 2015 the Council acquired the site and the rights and obligations formerly vested in SEEDA under the DA. The Phases are now as follows: Phase 1 (cinema, hotel, restaurants, retail units and car park), Phase 2 (200 residential flats) and Phase 3 (yet to be agreed). The parties have now agreed certain changes to the DA.
  • The Authority are seeking to appoint Contractor(s) for the Supply and Delivery of Fitting, Repair and Refurbishment of Floor Coverings to multiple sites and locations throughout Scotland.
  • Procure Plus are a value focused, not for profit company that specialises in the procurement of goods and services related to both the new build, repair, and maintenance of social housing. Originally focussed in the North West, Procure Plus are now extending their offer with the aim of delivering a service across the UK. Procure Plus wishes to procure and enter into a framework agreement for the supply and installation of low and zero-carbon technologies.
  • YPO are looking for providers to be appointed onto a framework agreement for the provision of floor machines. The framework is designed to meet the needs of all public sector organisations which includes YPO’s internal requirements. This framework is designed to meet the needs of YPO by establishing an agreement for providers to deliver stock into YPO’s distribution centre in Wakefield, West Yorkshire and to YPO customers across the UK on a ‘direct delivery’ basis whereby the end customer places the order with YPO and YPO places the order with the provider, but the provider delivers direct to the end customer.
  • Installation of ducting and foundation works for electric vehicle charge points
  • To carry out specialist adaptations work for Barnet Homes -to social housing tenants
/images/banners/LB26Banner250x250px-optimize.gif