Mechanical Sweeper, Road Sweeper Hire, Bond Coat Spraying, Joint Sealant Services, Road Marking Services
London Build 2026

Search results for repair works

Search results in Tenders

  • The works are the supply, installation, construction and commissioning of a 132 kV AC Substation element of the Shetland HVDC link project, as further defined in the works information.
  • PRP040 Structural Steel , Breadsall Primary School, Brookside Road,Breadsall, Derby, DE21 5LF
  • ESB is seeking expressions of interest to obtain a place on a qualification system that will be established for EPC companies to: Design, Supply, Install and Maintain all elements of a ground mounted solar development. The projects will be located in Ireland and the UK, and the qualification system may include projects developed by ESB, ESB joint venture companies (existing or yet to be formed), ESB subsidiary companies or companies ESB Group has a minority interest in. ESB plans to develop ground-mounted solar farms commencing in 2019, through a pipeline of planned projects. Applicants should note that the detailed scope and contracting strategy for each project will be determined in any subsequent procurement competition (which may include a further pre-qualification process before the tender phase).
  • The Enabling Civils Works (Package 2) (ECW2) Contract is to carry out the enabling civils works for HS2 Phase 2a, consisting of the construction of a bridge and associated slip roads across the M6 motorway at Yarnfield Lane, Stone, Staffordshire, together with highways improvements to Yarnfield lane; and off-route road improvement schemes at 20 locations across the line of route that are intended to mitigate the effects of increased traffic numbers during the main HS2 construction works with associated survey works. The Contract included route wide engineering and environmental surveys to inform the design of the railway.
  • The proposed works covered under the Highways Capital Improvement Projects Term Contract typically but not exhaustively include: New kerbing and footway works; Carriageway realignment, reconstruction, planing and surfacing works; Junction improvement works; Traffic Signal Junctions and Controlled Crossings (Puffin, Toucan and Pegasus); Installation of Bus Stops and pedestrian crossing point to DDA standards; Provisions for cycling; Installation of street furniture; Traffic calming features. Site-specific details will be issued with the individual works packages.
  • The works consist of EHV Tower and Mast refurbishments consisting of mast replacement, re-insulation, painting, replacement of foundation muffs and tower furniture. The projects will be delivered in 2021-2022 and are geographically located in the Northeast and Yorkshire License areas.
  • The Council wishes to establish a Contract for the demolition of the houses located off Wellhead Lane followed by the remediation of the site. The works comprise general site clearance, removal of asbestos containing materials and demolition of the houses located off Wellhead Lane in Perry Barr, Birmingham.
  • The contracting authority wishes to procure a suitably qualified and competent contractor(s) to provide minor works and services for the Direct Labour Organisation. Full details can be found within the attached tender documents.
  • The University is seeking experienced Painting & Decorating Contractors that can provide both expert advice and a high quality service. Works will mainly be at the three campuses - City NG1 4FQ, Clifton NG11 8NS, Brackenhurst NG25 0QF.
  • The procurement is in relation to a planned programme of works to return various of the authority’s housing stock to compliance with current (and proposed) building regulations in respect of fire safety. The authority has commissioned a series of fire risk assessments and facade surveys to inform the condition of the stock and the remedial works necessary to return blocks found to be non-compliant to standard.
  • Works contract for design and construction of 49 residential units and associated work and landscaping improvements at Rennie Estate Garages
  • The scope of works includes but is not limited to the Pre-Commencement, Construction, Demolition, Protection of retained services.
  • Swansea University is looking to procure a development partner to carry out a further phase of expansion and development works on, or near to, its Bay Campus. The works will comprise the: - construction and delivery of between 20,000 and 30,000 square meters of academic development, and ancillary retail and support facilities located on the Bay Campus; - construction, maintenance and operation of a minimum of six hundred (600) (and a maximum of fifteen hundred (1500)) accommodation units either on, or near to, the Bay Campus; and - potential construction and delivery of additional ancillary student space, welfare facilities and place-making such as (but not limited to) sports or music facilities.
  • Lincolnshire Housing Partnership is seeking to engage the services of a contractor to carry out the design, supply and installation and commissioning of a replacement sewage treatment plant to the Brown Drove site located in Boston, Lincolnshire.
  • The Project comprises the provision of a HTM compliant ventilation system to the proposed POCU Unit at Clatterbridge Hospital, Wirral, Merseyside.
  • North Star are looking for a provider of electrical PIR Testing. A full detailed scope of works can be obtained from our e-procurement portal .
  • Creag Riabhach Windfarm Connection. Supply & Construct the electricity power line between the windfarm and transmission substation.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of the South Breakwater and other ancillary works, inclusive of the recommissioning and operation of the existing on-site accropode manufacturing facility for the manufacture of the final accropodes required for the construction of the South Breakwater.Provision of Insitu concrete shall be free issue by the client.
  • The Council is carrying out this procurement process to establish a multi supplier Framework Agreement to provide the supply on an ex works basis
  • The lotting structure for this framework is based on contract value and the works cover a variety of works, including, but not limited to Public realm works, Highways construction works, Highways structure works, Drainage works, Marine / coastal / river works
/images/banners/LB26Banner250x250px-optimize.gif