BuildTech Week 2026
London Build 2026

Search results for surface works

Search results in Tenders

  • To design and construct a communal soakaway to serve 17 residential properties. The work will include connection to the existing drainage network. The new soakaway will be required to cross under a residential dwelling.
  • Supply of Submersible / Immersible and surface pump hire. Repair and maintenance services of pumps.
  • Installation of ducting and foundation works for electric vehicle charge points
  • The minor highway framework is to support Highways Maintenance Service with minor Civil Engineering projects
  • These works have been broken down into 4 different work packages, they include: - Package 1 - Kingsway Box Sewer Works, Package 2 - Covered Approaches - Repairs, Package 3 - Covered Approaches - Painting, Package 4 - Retaining Walls and Overbridges
  • TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. TWUL recognises these as infrastructure – nominally the underground network of water mains and sewage and non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region.
  • The Council is carrying out this procurement process to establish a multi supplier Framework Agreement to provide the supply on an ex works basis
  • The purpose of this Notice is to inform the market of the additional works/services to be performed by UBB Waste (Essex) Limited following a proposed amendment of its contract with ECC for the design, construction, commissioning, operation and handback of a mechanical biological treatment facility in Basildon. The facility did not pass the acceptance tests specified in the contract which led to ECC commencing litigation against the contractor. The Authority has given notice that it is proposing to take a decision to enter into an Agreement to settle that litigation and to amend the handback requirements of the contract such that the site will be returned to ECC in a condition that will allow for its future redevelopment. It is expected that the modified contract will expire in 2040.
  • The contract is for the contractor to develop with the Council a high-performing, comprehensive highways service. The contract encompasses highway maintenance, design, construction, transport planning, consultancy with other services including but not limited to vehicle and grounds maintenance.
  • Framework for the design, manufacture and installation of structural steelwork, metalwork and permanent access fabrications. To be CE Marked to Execution Class II.
  • Following a procurement exercises Hackney Council has awarded a contract for the provision of Highways Maintenance, covering improvement of footways, carriageways, street lighting and other associated highways maintenance works. These works will enable the successful delivery of the capital improvement programme, reactive maintenance works and other associated works, carried out under a Measured Term Contract.
  • The scope of works will entail building new stabling roads. This will require additional track, new Switch and Crossings (S&C) units, platforms, walkways, lighting, communications and signalling.
  • The lotting structure for this framework is based on contract value and the works cover a variety of works, including, but not limited to Public realm works, Highways construction works, Highways structure works, Drainage works, Marine / coastal / river works
  • TfW has awarded a supply contract to Siemens Mobility for the purchase of Side entry 8DA11 CGIS (Contained Gas Insulated Switchgear).
  • Engineering services - This framework is for engineering and technical consultancy services. These service will primarily relate to civil engineering and other associated discipline.
  • This tender is for the collection of wave characterisation data at Pevensey Bay, Sussex. The mixed, shingle barrier beach at Pevensey Bay, Sussex, represents a crucial asset in flood defence and coastal risk management along the East Sussex coastline. The 9 km frontage is highly dynamic, and suffers a net loss of sediment due to littoral drift, partly blocked by the Sovereign Harbour breakwaters. The spatial and temporal variations in beach volume, erosion and rollback remain poorly understood, and interventions to redistribute beach material are continuous.
  • The Dynamic Purchasing System (DPS) will provide a platform for suppliers to compete for Minor Civils Gas Works, including, but not limited to, Minor Gas Works, Temporary Works and Specialist Works. The scope of these works may include Design and Build or Build Only and can range from either one-off projects to small programmes of work.
  • The requirement is to undertake various works to the existing school at Mount Pleasant Road. These shall include repairs to the existing clock tower and the replacement of perimeter fencing and gates; all as more specifically described within the tender documents.
  • This contract is for the re-decoration and associated repair works to the external areas and internal communal areas of Red Kite Community Housing's residential properties.
  • Suitably qualified and competent contractors will make up an approved list of companies that will work in partnership to deliver services or works for construction, repairs and maintenance on an as and when basis, to meet the demands of peaks and troughs and to utilise specialist companies for services or works not currently carried out by internal teams
/images/banners/proptech_show_250_250.jpg