Mechanical Sweeper, Road Sweeper Hire, Bond Coat Spraying, Joint Sealant Services, Road Marking Services
London Build 2026

Search results for surface works

Search results in Tenders

  • Lincolnshire Housing Partnership is seeking to engage the services of a contractor to carry out the design, supply and installation and commissioning of a replacement sewage treatment plant to the Brown Drove site located in Boston, Lincolnshire.
  • The works comprise the annual service and maintenance to all Association owned appliances of gas heating systems and appliances following manufacturer’s requirements and shall include everything necessary for this check, including but not restricted to all labour, parts etc., of all gas installations, including appliances and flues. Also included will be the annual servicing and maintenance of unvented hot water cylinders. The pricing of the works will be on an all inclusive annual basis for all works, servicing and reactive maintenance.
  • The Project comprises the provision of a HTM compliant ventilation system to the proposed POCU Unit at Clatterbridge Hospital, Wirral, Merseyside.
  • North Star are looking for a provider of electrical PIR Testing. A full detailed scope of works can be obtained from our e-procurement portal .
  • Creag Riabhach Windfarm Connection. Supply & Construct the electricity power line between the windfarm and transmission substation.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of the South Breakwater and other ancillary works, inclusive of the recommissioning and operation of the existing on-site accropode manufacturing facility for the manufacture of the final accropodes required for the construction of the South Breakwater.Provision of Insitu concrete shall be free issue by the client.
  • The works include the removal of the existing sanitary provisions, the removal of the floor tiles and breaking out of the screed (depth unknown). The replacement of the floor screed, with reinforcement, and retile, subdivision of the female facilities to provide a Part M compliant cubical including new blockwork wall and ramped access and forming of new door to serve the altered female facilities.
  • DPS for the Provision of Conversion, Refurbishment and Specialist Minor Works
  • Project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project.
  • North Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Framework - Instrumentation and control equipment - Pumps - Construction work - Electrical engineering installation works - Mechanical engineering installation works - Repair and maintenance services of pumps
  • The scope of the works is a measured term contract for specialist flooring contractors to supply and installation various floor coverings such as carpet tiles, vinyl sheet coverings including accessories and sealing wood floors at various Council properties and locations.
  • Provision of non-complex works at stations, remedial works to existing structures, major & complex works to stations and Infrastructure Owner works (structures, fencing, civil works and buildings and property) across the Wales and Borders rail infrastructure.
  • Trunk road construction work, Construction work for bridges, Engineering design services. The Welsh Ministers (WM) have let a contract to design and construct approximately 6.1km of new trunk road to the north of Llanddewi Velfrey and Narberth under the “A40 Llanddewi Velfrey to Redstone Cross Improvements Project”. The scheme will also include a package of Active Travel and De-trunking works to the old A40 carriageway.
  • The Trust has awarded new Civil Engineering Construction Framework Contracts under NEC4 to two National Framework Contracts for undertaking complex civil works, and nine Regional Framework contracts for non-complex civil works.
  • The Council is seeking to appoint a single specialist contractor to deliver mains water excavation repairs. This will include excavations to access burst mains through soft and hard ground, mains water pipe work repairs inside individual properties and communal areas, and mains water pipework re-runs.
  • This contract will provide Freebridge with a turn key roofing supplier for all demands by the business. The Contract will be let on an “all-inclusive” basis incorporating the National Housing Federation Schedule of Rates suite of documentation as set out in the draft Articles of Agreement completed in accordance with the Contract Details included with the Procurement Documents. The contract is none exclusive and there is no guaranteed of supply, the forecast spend is £850,000 per annum.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of a Crown Wall approximately 630m long by 15m high (Varying heights) on top of an existing rouble mound breakwater.
  • Type of contract: Works. outhside district situated in the heart of Chinatown attracts visitors and tourists to the city centre and is one of the most diverse and creative areas of Birmingham. It lies within the boundary of the City Centre Economic Zone (EZ). The Council wishes to establish a contract to carry out work to Southside Public Realm.
  • The objective of this contract is the supply, transportation, and construction of stone, timber, plastic, heather bale and natural fibre log dams in gully systems on restoration work sites around the Peak District and South Pennines SAC. It also includes the construction of peat dams, peat bunds and the re-profiling of hag/gully sides.
  • LTE Group are looking to contract a supplier to design and refurbish an existing facility at HMP Wormwood Scrubs and purchase industry standard equipment and tools to reflect real working environments in the community.
/images/banners/London_Build_2026_250x250.webp