Waterproofing Solutions
London Build 2026

Search results for civils work

Search results in Tenders

  • The purpose of this tender process is to select two Service Providers - One for Asbestos Surveying and Legionella Risk Assessment services, and another to provide Asbestos Removal Services
  • Rochdale Borough Council (RBC) on behalf of Rochdale Development Agency (RDA) are tendering for a Contractor who is required to carry out the design, engineering, procurement, construction, testing, commissioning and handover of the Chamber House Solar Farm (the Solar Farm, or Project) and then operate and maintain the system until Completion. This project forms part of the wider Unlocking Clean Energy in Greater Manchester (UCEGM) European Regional Development Funded (ERDF) project and as such is part grant funded by ERDF The Solar Farm shall have a 30-year design life and shall generate and export power to the Point of Supply (PoS) defined in the grid connection offer provided by Electricity North West (ENW, or the Distribution Network Operator (DNO)).
  • TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. TWUL recognises these as infrastructure – nominally the underground network of water mains and sewage and non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region.
  • Appointment of a Project Manager led Integrated Consultant Team for the delivery of the new Greenisland PS, Carrickfergus. Approximate services value £325k-375k. The Integrated Consultant Team to provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, provision of architectural, quantity surveying, structural, services engineering, civil and structural services for delivery of the proposed School Enhancement Programme (SEP) project.
  • The procurement is in relation to a planned programme of works to return various of the authority’s housing stock to compliance with current (and proposed) building regulations in respect of fire safety. The authority has commissioned a series of fire risk assessments and facade surveys to inform the condition of the stock and the remedial works necessary to return blocks found to be non-compliant to standard.
  • The works are the supply, installation, construction and commissioning of a 132 kV AC Substation element of the Shetland HVDC link project, as further defined in the works information.
  • Raven Housing Trust is inviting suitably qualified and experienced contractors to be appointed to join their Dynamic Purchasing System DPS to support their Planned Maintenance and Responsive Repairs requirements.
  • ENP wishes to procure and enter into a Framework Agreement for the completion of a range of installation and repair works for planned maintenance and some servicing or/and maintenance works for cyclical or responsive maintenance predominantly in social housing properties but works may also be carried out in other public buildings including but not limited to offices.
  • The proposed works covered under the Highways Capital Improvement Projects Term Contract typically but not exhaustively include: New kerbing and footway works; Carriageway realignment, reconstruction, planing and surfacing works; Junction improvement works; Traffic Signal Junctions and Controlled Crossings (Puffin, Toucan and Pegasus); Installation of Bus Stops and pedestrian crossing point to DDA standards; Provisions for cycling; Installation of street furniture; Traffic calming features. Site-specific details will be issued with the individual works packages.
  • NHS Greater Glasgow and Clyde (GG&C) (“the participating authority”) require suitably qualified, competent and experienced Consultants to provide a range of Asbestos Surveying and Analytical Services through a framework agreement.
  • Design, Supply and Installation of Electronic Security Equipment across the Parliamentary Estate. The Authority has engaged two contractors for the design, supply and installation of electronic security equipment over a maximum term of 6 years (initially a 4-year term with potentially two 12-month extensions). Mini-competitions or direct awards will be issued based on the NEC3 or NEC4 suite of contracts. An invitation to tender (ITT) was issued providing full details of the framework. Works will be awarded by mini-competition or direct award, where value for money can be demonstrated. The allocation of the work via direct awards, and to maintain a position on the framework, is subject to a performance management regime using key performance indicators.
  • The Association has identified or will identify potential development opportunities primarily in Ayrshire and Dumfries & Galloway, to be procured between 2019 and 2023. These developments could involve the construction of up to approximately 800 new residential properties and various commercial/ non-housing projects over the next 4 years
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of the South Breakwater and other ancillary works, inclusive of the recommissioning and operation of the existing on-site accropode manufacturing facility for the manufacture of the final accropodes required for the construction of the South Breakwater.Provision of Insitu concrete shall be free issue by the client.
  • The Contracting Entity intends to procure a Framework Agreement for the provision of scaffolding services to ESB Generating Stations. The Framework will be divided into 4 regional Lots. ESB intend to enter into a multi-party framework agreement for each Lot. One company may submit a proposal for one or more of the Lots. It is proposed that the Contract will include (but not be limited to) all requirements for scaffolding work in ESB Generating Stations on the island of Ireland, from small requirements to major overhauls. The scaffolding requirement will vary from location to location and with the nature of the specific task. This is a high level description of the services required.
  • Supply of Double Glazed Units and Sheet Glass - DPS. Works
  • Repair and maintenance of fluid and gas filled electricity cable.
  • North Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Framework - Instrumentation and control equipment - Pumps - Construction work - Electrical engineering installation works - Mechanical engineering installation works - Repair and maintenance services of pumps
  • Project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project.
  • Cadent Gas Limited requires a Local Delivery Partners (LDP’s) to support the delivery of our Gas Mains Replacement Program (MRP) and Non-Mains Replacement Program (Non-MRP) as part of the RIIO2 price control period. Currently Cadent replace approximately 2000 km of mains per year delivered by our existing suppliers. It is our intention to let a number of packages of work tendered via the Dynamic Procurement System (DPS) for MRP and Non-MRP within Cadent’s networks. The works will comprise of excavation, back-fill and reinstatement to facilitate Mains and Service replacement and abandonment including all necessary job completion data and data required for Regulatory Reporting
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of a Crown Wall approximately 630m long by 15m high (Varying heights) on top of an existing rouble mound breakwater.
/images/banners/3rd World Conference_250.png