Free Listing Directory in Construction Area
BuildTech Week 2026

Search results for Lift installation work

Search results in Tenders

  • Repair and maintenance of fluid and gas filled electricity cable.
  • Project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project.
  • Cadent Gas Limited requires a Local Delivery Partners (LDP’s) to support the delivery of our Gas Mains Replacement Program (MRP) and Non-Mains Replacement Program (Non-MRP) as part of the RIIO2 price control period. Currently Cadent replace approximately 2000 km of mains per year delivered by our existing suppliers. It is our intention to let a number of packages of work tendered via the Dynamic Procurement System (DPS) for MRP and Non-MRP within Cadent’s networks. The works will comprise of excavation, back-fill and reinstatement to facilitate Mains and Service replacement and abandonment including all necessary job completion data and data required for Regulatory Reporting
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of a Crown Wall approximately 630m long by 15m high (Varying heights) on top of an existing rouble mound breakwater.
  • The Authority are seeking to appoint Contractor(s) for the Supply and Delivery of Fitting, Repair and Refurbishment of Floor Coverings to multiple sites and locations throughout Scotland.
  • The Enabling Civils Works (Package 2) (ECW2) Contract is to carry out the enabling civils works for HS2 Phase 2a, consisting of the construction of a bridge and associated slip roads across the M6 motorway at Yarnfield Lane, Stone, Staffordshire, together with highways improvements to Yarnfield lane; and off-route road improvement schemes at 20 locations across the line of route that are intended to mitigate the effects of increased traffic numbers during the main HS2 construction works with associated survey works. The Contract included route wide engineering and environmental surveys to inform the design of the railway.
  • Refurbishment of Needham ward in Ipswich Hospital, East Suffolk and North Essex NHS Foundation Trust
  • Following a procurement exercises Hackney Council has awarded a contract for the provision of Highways Maintenance, covering improvement of footways, carriageways, street lighting and other associated highways maintenance works. These works will enable the successful delivery of the capital improvement programme, reactive maintenance works and other associated works, carried out under a Measured Term Contract.
  • The contract is for the contractor to develop with the Council a high-performing, comprehensive highways service. The contract encompasses highway maintenance, design, construction, transport planning, consultancy with other services including but not limited to vehicle and grounds maintenance.
  • DPS for the Provision of Conversion, Refurbishment and Specialist Minor Works
  • This service provides assistance to the Department in the delivery of Roads + Rivers programmes. Provides a wide spectrum of civil engineering consultancy services and associated specialist services.
  • The contract covers all Fife Council’s public buildings including schools, halls, sports centres, older person’s homes, offices, sheltered housing complexes, social work services group homes and education services janitorial houses which are of a more domestic nature, plant and equipment consisting of but not limited to natural gas, LPG and oil- fired commercial boilers, water heaters, radiant tube heaters, warm air heaters
  • This contract is for the re-decoration and associated repair works to the external areas and internal communal areas of Red Kite Community Housing's residential properties.
  • Carmarthen, For the exhibition and fit out works to the Museum of Land Speed in Pendine, to include reception and shop. The exhibition works include furniture items, setworks, showcases, plinths, graphic production, AV hardware, AV software (one exhibit), manual and digital interactives, models, electrics and lighting.
  • Design, Development, Delivery and Operation of Extra Care Housing on Sites at Gosport, New Milton and Petersfield
  • A contract is required for asbestos surveying to domestic properties and asbestos air monitoring, sampling and surveying to non-domestic properties to Council owned properties throughout the North Lanarkshire Council area.
  • In line with the ‘Getting the Best from Complaints Social Care Complaints and Representations for Children, Young People and Others’ guidance Coventry City Council recognises a good procedure ensures that children and young people who make representations should have their concerns swiftly resolved, and, wherever possible, by the people who provide the service locally. The purpose of this procurement is to recruit a ‘bank’ of Independent Complaints Investigating Officers, Independent Persons, Independent Chairs of Review Panels and Review Panellists who will undertake, in line with statutory guidance for local authority children’s services representations and complaints procedures, a Stage 2 investigation or Stage 3 review panel.
  • This contract is for the provision of grounds maintenance (including weed control) within NI Water sites across Northern Ireland. Services required under this contract will include grass cutting, removal and disposal of grass cuttings (where appropriate e.g. first cut), edge maintenance, hedge trimming, shrub pruning, tree surgery and weed control.
  • Call off schemes under a framework to remove asbestos from sites on a call off basis based on a basket of rates. 6 regional lots based on the geographical areas in the Yorkshire & Humber Police forces and Northumbria and Durham.
  • The purpose of this Notice is to inform the market of the additional works/services to be performed by UBB Waste (Essex) Limited following a proposed amendment of its contract with ECC for the design, construction, commissioning, operation and handback of a mechanical biological treatment facility in Basildon. The facility did not pass the acceptance tests specified in the contract which led to ECC commencing litigation against the contractor. The Authority has given notice that it is proposing to take a decision to enter into an Agreement to settle that litigation and to amend the handback requirements of the contract such that the site will be returned to ECC in a condition that will allow for its future redevelopment. It is expected that the modified contract will expire in 2040.
/images/banners/London_Build_2026_250x250.webp