Free Listing Directory in Construction Area
BuildTech Week 2027

Search results for Overhead line construction

Search results in Tenders

  • The works consist of EHV Tower and Mast refurbishments consisting of mast replacement, re-insulation, painting, replacement of foundation muffs and tower furniture. The projects will be delivered in 2021-2022 and are geographically located in the Northeast and Yorkshire License areas.
  • TfW has awarded a supply contract to Siemens Mobility for the purchase of Side entry 8DA11 CGIS (Contained Gas Insulated Switchgear).
  • Monitoring of water quality in systems across the Borough in line with Regulations.The initial contract term will be for 3 years with an option to extend for one further period of 2 years (3+2) for a potential total contract term of 5 years as stated in the ITT documents. Estimated contract spend is up to £80,000.00 per annum, £240,000 across the initial 3 year contract term and up to £400,000.00 across the potential total 5 year contract term.
  • Creag Riabhach Windfarm Connection. Supply & Construct the electricity power line between the windfarm and transmission substation.
  • In line with the ‘Getting the Best from Complaints Social Care Complaints and Representations for Children, Young People and Others’ guidance Coventry City Council recognises a good procedure ensures that children and young people who make representations should have their concerns swiftly resolved, and, wherever possible, by the people who provide the service locally. The purpose of this procurement is to recruit a ‘bank’ of Independent Complaints Investigating Officers, Independent Persons, Independent Chairs of Review Panels and Review Panellists who will undertake, in line with statutory guidance for local authority children’s services representations and complaints procedures, a Stage 2 investigation or Stage 3 review panel.
  • The Enabling Civils Works (Package 2) (ECW2) Contract is to carry out the enabling civils works for HS2 Phase 2a, consisting of the construction of a bridge and associated slip roads across the M6 motorway at Yarnfield Lane, Stone, Staffordshire, together with highways improvements to Yarnfield lane; and off-route road improvement schemes at 20 locations across the line of route that are intended to mitigate the effects of increased traffic numbers during the main HS2 construction works with associated survey works. The Contract included route wide engineering and environmental surveys to inform the design of the railway.
  • TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. TWUL recognises these as infrastructure – nominally the underground network of water mains and sewage and non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region.
  • The Council wishes to establish a Contract for the demolition of the houses located off Wellhead Lane followed by the remediation of the site. The works comprise general site clearance, removal of asbestos containing materials and demolition of the houses located off Wellhead Lane in Perry Barr, Birmingham.
  • The design, installation and commissioning of a 3MW ground mounted solar farm at Newcastle International Airport
  • Following a procurement exercises Hackney Council has awarded a contract for the provision of Highways Maintenance, covering improvement of footways, carriageways, street lighting and other associated highways maintenance works. These works will enable the successful delivery of the capital improvement programme, reactive maintenance works and other associated works, carried out under a Measured Term Contract.
  • Supply of vacuum insulated tubing (VIT) and ancillaries for a coaxial circulation system in the first deep geothermal well at the Eden Project, Cornwall PL24 2SG, UK
  • This service provides assistance to the Department in the delivery of Roads + Rivers programmes. Provides a wide spectrum of civil engineering consultancy services and associated specialist services.
  • Provision of non-complex works at stations, remedial works to existing structures, major & complex works to stations and Infrastructure Owner works (structures, fencing, civil works and buildings and property) across the Wales and Borders rail infrastructure.
  • Type of contract: Works. outhside district situated in the heart of Chinatown attracts visitors and tourists to the city centre and is one of the most diverse and creative areas of Birmingham. It lies within the boundary of the City Centre Economic Zone (EZ). The Council wishes to establish a contract to carry out work to Southside Public Realm.
  • DAERA requires the Contractor to deliver a repeat of the NI Countryside Survey to provide a statistically robust assessment of land cover change and habitat condition in NI since the previous Countryside Survey in 2007. The Contractor will use this data to assess the outcomes of the current NI agri-environment scheme (EFS) in terms of habitat condition and establishment of green infrastructure. In addition, the Contractor will be required to record primary measurements of soil condition which influence soil function. This will form a baseline assessment of soil condition and function in NI Countryside Survey squares and will assess the linkages between soil condition and overlying vegetation.
  • The City of Edinburgh Council is seeking to appoint a suitably qualified Development Partner for the delivery of a major mixed use scheme on a 3-hectare site at Fountainbridge. The development requirements for the site comprise of at least 436 homes and a separate office building. The proposals also include retail and commercial space which could be used for a variety of purposes. It is expected that the Development Partner would construct approximately 177 affordable homes, with ground floor retail for the Council, while the office space, remaining residential units, and ground floor retail/commercial space would represent a development opportunity.
  • The framework agreement covers the provision of comprehensive and innovative waste solutions and suppliers will be expected to proactively assist in attempts to reduce the quantities of waste sent to landfill and achieve recycling targets. This is in line with the revised Waste (England and Wales) Regulations 2011 that prioritise the waste hierarchy.
  • The primary objective of the sub-lot is refurbishment and repair of furniture. Repair and maintenance services of furniture.
  • Northern Gas Networks (NGN) requires a framework of suppliers to call on for various services (lots) within the business stakeholder engagement arena.
  • Keynvor Morlift Ltd (KML) invites all suitable companies to tender for a call off contract for the supply of Construction workers for their Falmouth Wharves Marine Hub Project. The role of the supplier under this contract will be to provide workers across the construction trades to support the refurbishment and repair works on site. These works will include the renovation of commercial buildings, improvements to the site's external spaces and repairs to the piled wharf structure. You will be required to supply multi skilled workers with experience of working on commercial construction projects. They will be required to have relevant construction site qualifications, trades certificates and where necessary
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif