Waterproofing Solutions
London Build 2026

Search results for civil engineer

Search results in Tenders

  • The minor highway framework is to support Highways Maintenance Service with minor Civil Engineering projects
  • This service provides assistance to the Department in the delivery of Roads + Rivers programmes. Provides a wide spectrum of civil engineering consultancy services and associated specialist services.
  • To provide tunnel labour comprising fitters and electricians at the main drive sites of the TBM tunnelling operations at Chambers Wharf and Greenwich for a period commencing October to 2023.
  • Thenue HA's consultant framework is scheduled to be renewed this year and they are seeking to appoint suitably qualified consultants to provide professional services for the design and delivery of various projects within this framework.
  • Following a procurement exercises Hackney Council has awarded a contract for the provision of Highways Maintenance, covering improvement of footways, carriageways, street lighting and other associated highways maintenance works. These works will enable the successful delivery of the capital improvement programme, reactive maintenance works and other associated works, carried out under a Measured Term Contract.
  • Appointment of a Project Manager led Integrated Consultant Team for the delivery of the new Greenisland PS, Carrickfergus. Approximate services value £325k-375k. The Integrated Consultant Team to provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, provision of architectural, quantity surveying, structural, services engineering, civil and structural services for delivery of the proposed School Enhancement Programme (SEP) project.
  • The Trust has awarded new Civil Engineering Construction Framework Contracts under NEC4 to two National Framework Contracts for undertaking complex civil works, and nine Regional Framework contracts for non-complex civil works.
  • The lotting structure for this framework is based on contract value and the works cover a variety of works, including, but not limited to Public realm works, Highways construction works, Highways structure works, Drainage works, Marine / coastal / river works
  • The contracting authority wishes to procure a suitably qualified and competent contractor(s) to provide minor works and services for the Direct Labour Organisation. Full details can be found within the attached tender documents.
  • The Enabling Civils Works (Package 2) (ECW2) Contract is to carry out the enabling civils works for HS2 Phase 2a, consisting of the construction of a bridge and associated slip roads across the M6 motorway at Yarnfield Lane, Stone, Staffordshire, together with highways improvements to Yarnfield lane; and off-route road improvement schemes at 20 locations across the line of route that are intended to mitigate the effects of increased traffic numbers during the main HS2 construction works with associated survey works. The Contract included route wide engineering and environmental surveys to inform the design of the railway.
  • The design, installation and commissioning of a 3MW ground mounted solar farm at Newcastle International Airport
  • The framework is for the supply and fitting of window blinds and curtains for office accommodation and the cleaning of existing blinds for use across the Northern Ireland Civil Service and the wider public sector.
  • Suitably qualified and competent contractors will make up an approved list of companies that will work in partnership to deliver services or works for construction, repairs and maintenance on an as and when basis, to meet the demands of peaks and troughs and to utilise specialist companies for services or works not currently carried out by internal teams
  • Cadent Gas Limited requires a Local Delivery Partners (LDP’s) to support the delivery of our Gas Mains Replacement Program (MRP) and Non-Mains Replacement Program (Non-MRP) as part of the RIIO2 price control period. Currently Cadent replace approximately 2000 km of mains per year delivered by our existing suppliers. It is our intention to let a number of packages of work tendered via the Dynamic Procurement System (DPS) for MRP and Non-MRP within Cadent’s networks. The works will comprise of excavation, back-fill and reinstatement to facilitate Mains and Service replacement and abandonment including all necessary job completion data and data required for Regulatory Reporting
  • Engineering services - This framework is for engineering and technical consultancy services. These service will primarily relate to civil engineering and other associated discipline.
  • Transport Scotland, on behalf of the Scottish Ministers, has identified the requirement to appoint multi-disciplinary Consultants to provide services for forthcoming roads related transport infrastructure projects and schemes to support its investment in and improvement of the trunk road and transportation infrastructure network.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of a Crown Wall approximately 630m long by 15m high (Varying heights) on top of an existing rouble mound breakwater.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of the South Breakwater and other ancillary works, inclusive of the recommissioning and operation of the existing on-site accropode manufacturing facility for the manufacture of the final accropodes required for the construction of the South Breakwater.Provision of Insitu concrete shall be free issue by the client.
  • Provision of non-complex works at stations, remedial works to existing structures, major & complex works to stations and Infrastructure Owner works (structures, fencing, civil works and buildings and property) across the Wales and Borders rail infrastructure.
  • The framework agreement covers the provision of comprehensive and innovative waste solutions and suppliers will be expected to proactively assist in attempts to reduce the quantities of waste sent to landfill and achieve recycling targets. This is in line with the revised Waste (England and Wales) Regulations 2011 that prioritise the waste hierarchy.
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif