Waterproofing Solutions
London Build 2026

Search results for design

Search results in Tenders

  • Procurement for Housing seeks to establish a Dynamic Purchasing System for Asset Decarbonisation and Retrofit Solutions, providing a singular solution for our membership to design, assess and deliver their net zero ambitions. The DPS includes provision for goods, works and services and is open to social housing providers and the wider public sector across Scotland.
  • The contract is for the contractor to develop with the Council a high-performing, comprehensive highways service. The contract encompasses highway maintenance, design, construction, transport planning, consultancy with other services including but not limited to vehicle and grounds maintenance.
  • The primary objective of the sub-lot is refurbishment and repair of furniture. Repair and maintenance services of furniture.
  • Engineering services - This framework is for engineering and technical consultancy services. These service will primarily relate to civil engineering and other associated discipline.
  • DELETTI (DEvon Low carbon Energy and Transport Technology Innovator) is a European Regional Development Fund (ERDF) part-funded programme that aims to continue the low carbon transport and energy transformation, through the expansion of electric vehicle charge points (EVCPs), solar carports and developing new, local energy models. This is the procurement for phase 2 of the DELETTI charge points project. The capital costs of Phase 2 are funded by the UK government’s the On-street Residential Charge point Scheme (ORCS).
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of the South Breakwater and other ancillary works, inclusive of the recommissioning and operation of the existing on-site accropode manufacturing facility for the manufacture of the final accropodes required for the construction of the South Breakwater.Provision of Insitu concrete shall be free issue by the client.
  • The procurement is in relation to a planned programme of works to return various of the authority’s housing stock to compliance with current (and proposed) building regulations in respect of fire safety. The authority has commissioned a series of fire risk assessments and facade surveys to inform the condition of the stock and the remedial works necessary to return blocks found to be non-compliant to standard.
  • Following a procurement exercises Hackney Council has awarded a contract for the provision of Highways Maintenance, covering improvement of footways, carriageways, street lighting and other associated highways maintenance works. These works will enable the successful delivery of the capital improvement programme, reactive maintenance works and other associated works, carried out under a Measured Term Contract.
  • TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. TWUL recognises these as infrastructure – nominally the underground network of water mains and sewage and non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region.
  • ilvertown Quays (SQ) is a 50-acre brownfield site in Royal Docks, London owned by GLA. In June 2013, after a procurement process, GLA entered into a Master Development Agreement (MDA) with the developer, The Silvertown Partnership LLP (TSP). In June 2018, a joint venture of Starwood (SOF-11 Developments UK Holdco Lux S.à r.l.) (SW) and a group company of Lendlease Europe Holdings Ltd (LL) acquired control of TSP.
  • A development agreement (“DA”) was originally entered into in 2010 between the South East England Development Agency (“SEEDA”) and Stanhope PLC and concerned the re-development, in phases, of a site in the centre of Ashford known as Elwick Place according to a masterplan to be agreed between the parties. In 2015 the Council acquired the site and the rights and obligations formerly vested in SEEDA under the DA. The Phases are now as follows: Phase 1 (cinema, hotel, restaurants, retail units and car park), Phase 2 (200 residential flats) and Phase 3 (yet to be agreed). The parties have now agreed certain changes to the DA.
  • Fusion21 has developed a Framework for the full provision of building safety and compliance works and services across public sector estates. The scope of this lot includes asbestos consultancy, surveying, analysis, air monitoring, training and related services.
  • Provision of non-complex works at stations, remedial works to existing structures, major & complex works to stations and Infrastructure Owner works (structures, fencing, civil works and buildings and property) across the Wales and Borders rail infrastructure.
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif