Waterproofing Solutions
London Build 2026

Search results for team leader

Search results in Tenders

  • Thenue HA's consultant framework is scheduled to be renewed this year and they are seeking to appoint suitably qualified consultants to provide professional services for the design and delivery of various projects within this framework.
  • Appointment of a Project Manager led Integrated Consultant Team for the delivery of the new Greenisland PS, Carrickfergus. Approximate services value £325k-375k. The Integrated Consultant Team to provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, provision of architectural, quantity surveying, structural, services engineering, civil and structural services for delivery of the proposed School Enhancement Programme (SEP) project.
  • Ferguslie Park Housing Association wishes to appoint an architect led design team for the potential development of new housing in Ferguslie Park, Paisley.
  • Bromley Council (the Commissioning Authority and Client) is seeking to appoint a conservation architect-led multidisciplinary team with experience in managing the restoration of listed historic structures to repair, restore and conserve Crystal Palace Subway, with the ultimate aim of, in the future, transforming the Grade II* building into a commercially viable cultural events venue.
  • Our Facilities Management Team are looking to procure the services of a provider will maintain the heating, ventilation & air conditioning (HVAC) systems for our office and other locations around the West Midlands.
  • To carry out specialist adaptations work for Barnet Homes -to social housing tenants
  • This contract is for the re-decoration and associated repair works to the external areas and internal communal areas of Red Kite Community Housing's residential properties.
  • We are seeking a suitably experienced Supplier who has current experience of working within the dynamic environment, ideally with a strong operational base within the West Midlands, thus allowing for both adequate contract support and operational flexibility that is to be delivered to support the contract as and when needed moving forwards into this contract term.
  • These works have been broken down into 4 different work packages, they include: - Package 1 - Kingsway Box Sewer Works, Package 2 - Covered Approaches - Repairs, Package 3 - Covered Approaches - Painting, Package 4 - Retaining Walls and Overbridges
  • Staffordshire Fire & Rescue service require the existing windows and doors to its amenities building (at Pire Hill HQ) replacing.
  • Topographical Survey, GIS & Planning Tender Scope
  • Construction of 52 Nr new social housing units at Stratton Farm, Inverness. Construction of 52 Nr new social housing units at Stratton Farm, Inverness units comprising a mix of terraced, semi-detached, detached and flats. The flats are of traditional construction, whereas the houses are timber frame kit.
  • The Supply Chain Transformation Expansion (SCTX) programme is part of the Logistic Delivery Operations Centre (LDOC) within Defence Equipment & Support based in Abbey Wood Bristol.
  • Building works, supplies & services and specialists & consultancy as listed in the DPS. Complete a planned programme of insulation on approximately 1500 properties per year and then pick up responsive work when required.
  • Merseytravel seeks a suitably qualified facilities services company to provide cleaning, customer service and security at a number of public transport and ancillary locations across Merseyside, for the period 31 March 2021 to 31 March 2024 (with a possible extension of up to a further 2 years).
  • The design, installation and commissioning of a 3MW ground mounted solar farm at Newcastle International Airport
  • The procurement is in relation to a planned programme of works to return various of the authority’s housing stock to compliance with current (and proposed) building regulations in respect of fire safety. The authority has commissioned a series of fire risk assessments and facade surveys to inform the condition of the stock and the remedial works necessary to return blocks found to be non-compliant to standard.
  • Trunk road construction work, Construction work for bridges, Engineering design services. The Welsh Ministers (WM) have let a contract to design and construct approximately 6.1km of new trunk road to the north of Llanddewi Velfrey and Narberth under the “A40 Llanddewi Velfrey to Redstone Cross Improvements Project”. The scheme will also include a package of Active Travel and De-trunking works to the old A40 carriageway.
  • South Tyneside Council wishes to install a district heating system serving several Council owned buildings in central Hebburn utilising the disused mine workings under Hebburn as a heat source. The installation of such a district heating scheme will reduce the Council’s reliance on gas to provide heating and significantly contribute to the Council’s commitment to its Carbon Reduction targets, and this scheme alone will provide a saving of 319 tonnes/year saving. A separate contract has been awarded to undertake the drilling of two boreholes, and the construction of permanent abstraction and re-injection wells. The water source heat pump adopted in this project will be able to source heat from both the mine water as well as ambient air (via dry air cooler) in the event that the mines are found to be unable to provide a sustainable mine water heat source.
  • Northern Gas Networks (NGN) requires a framework of suppliers to call on for various services (lots) within the business stakeholder engagement arena.
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif