Free Listing Directory in Construction Area
Deko Construction Decoration

Search results for works

Search results in Tenders

  • The Council wishes to establish a Contract for the demolition of the houses located off Wellhead Lane followed by the remediation of the site. The works comprise general site clearance, removal of asbestos containing materials and demolition of the houses located off Wellhead Lane in Perry Barr, Birmingham.
  • The contracting authority wishes to procure a suitably qualified and competent contractor(s) to provide minor works and services for the Direct Labour Organisation. Full details can be found within the attached tender documents.
  • The University is seeking experienced Painting & Decorating Contractors that can provide both expert advice and a high quality service. Works will mainly be at the three campuses - City NG1 4FQ, Clifton NG11 8NS, Brackenhurst NG25 0QF.
  • The procurement is in relation to a planned programme of works to return various of the authority’s housing stock to compliance with current (and proposed) building regulations in respect of fire safety. The authority has commissioned a series of fire risk assessments and facade surveys to inform the condition of the stock and the remedial works necessary to return blocks found to be non-compliant to standard.
  • Works contract for design and construction of 49 residential units and associated work and landscaping improvements at Rennie Estate Garages
  • The scope of works includes but is not limited to the Pre-Commencement, Construction, Demolition, Protection of retained services.
  • Following a procurement exercises Hackney Council has awarded a contract for the provision of Highways Maintenance, covering improvement of footways, carriageways, street lighting and other associated highways maintenance works. These works will enable the successful delivery of the capital improvement programme, reactive maintenance works and other associated works, carried out under a Measured Term Contract.
  • Swansea University is looking to procure a development partner to carry out a further phase of expansion and development works on, or near to, its Bay Campus. The works will comprise the: - construction and delivery of between 20,000 and 30,000 square meters of academic development, and ancillary retail and support facilities located on the Bay Campus; - construction, maintenance and operation of a minimum of six hundred (600) (and a maximum of fifteen hundred (1500)) accommodation units either on, or near to, the Bay Campus; and - potential construction and delivery of additional ancillary student space, welfare facilities and place-making such as (but not limited to) sports or music facilities.
  • Lincolnshire Housing Partnership is seeking to engage the services of a contractor to carry out the design, supply and installation and commissioning of a replacement sewage treatment plant to the Brown Drove site located in Boston, Lincolnshire.
  • The works comprise the annual service and maintenance to all Association owned appliances of gas heating systems and appliances following manufacturer’s requirements and shall include everything necessary for this check, including but not restricted to all labour, parts etc., of all gas installations, including appliances and flues. Also included will be the annual servicing and maintenance of unvented hot water cylinders. The pricing of the works will be on an all inclusive annual basis for all works, servicing and reactive maintenance.
  • The Project comprises the provision of a HTM compliant ventilation system to the proposed POCU Unit at Clatterbridge Hospital, Wirral, Merseyside.
  • North Star are looking for a provider of electrical PIR Testing. A full detailed scope of works can be obtained from our e-procurement portal .
  • Creag Riabhach Windfarm Connection. Supply & Construct the electricity power line between the windfarm and transmission substation.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of the South Breakwater and other ancillary works, inclusive of the recommissioning and operation of the existing on-site accropode manufacturing facility for the manufacture of the final accropodes required for the construction of the South Breakwater.Provision of Insitu concrete shall be free issue by the client.
  • The works include the removal of the existing sanitary provisions, the removal of the floor tiles and breaking out of the screed (depth unknown). The replacement of the floor screed, with reinforcement, and retile, subdivision of the female facilities to provide a Part M compliant cubical including new blockwork wall and ramped access and forming of new door to serve the altered female facilities.
  • DPS for the Provision of Conversion, Refurbishment and Specialist Minor Works
  • The Council is carrying out this procurement process to establish a multi supplier Framework Agreement to provide the supply on an ex works basis
  • The lotting structure for this framework is based on contract value and the works cover a variety of works, including, but not limited to Public realm works, Highways construction works, Highways structure works, Drainage works, Marine / coastal / river works
  • The scope of works will entail building new stabling roads. This will require additional track, new Switch and Crossings (S&C) units, platforms, walkways, lighting, communications and signalling.
  • Project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project.
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif