London Bulid 2026
London Build 2026

Search results for Birmingham City Council

Search results in Tenders

  • Our Facilities Management Team are looking to procure the services of a provider will maintain the heating, ventilation & air conditioning (HVAC) systems for our office and other locations around the West Midlands.
  • PRP040 Structural Steel , Breadsall Primary School, Brookside Road,Breadsall, Derby, DE21 5LF
  • Arnold, Nottinghamshire and City of Nottingham Fire Authority (NFRS) is inviting expressions of interest from suitably qualified and experienced organisations interested in being invited to tender for the multi activity contract for planned, preventative and reactive maintenance services required to maintain the authority's estate.
  • PRP042 Roof Covering and Rainwater goods, Breadsall Primary School, Brookside Road,Breadsall, Derby, DE21 5LF
  • Supply of Double Glazed Units and Sheet Glass - DPS. Works
  • This opportunity related to a framework for the supply and delivery of heating, ventilation and plumbing materials. The Council was looking for a supplier who could provide an agreed range of heating, ventilation and plumbing materials.
  • Lift-maintenance services. The contract requires the supplier to provide a fully comprehensive lift service to the University. This includes the regular planned preventative maintenance, 24 hour breakdown response and all repairs to the lifts to keep them operating in a safe and reliable condition. The repairs include any defects that are reported within the LOLER Thorough Examinations and those identified during Maintenance Evaluation Audits by our Lift Consultants.
  • The project is for the management, supply and preservation of water across the Lincolnshire County. This project seeks to place instrumentation into water catchments to inform partners what happens to water from when rain hits the ground to when rivers outfall into the sea.
  • A dynamic procurement system is being developed now to provide a service that includes council property maintenance, new build properties, highway repairs, street lighting, home adaptations and void refurbishments as well as all the day to maintenance within the London Borough of Newham.
  • Buckinghamshire Council (the Authority) invites Tenders for the provision of dry recycling services, which include hauling, sorting and reprocessing of recyclables. The contract term is 3 years from 10 May 2021 to 9 May 2024 with the option to extend for up to a further 3 years to 9 May 2027.
  • Provision of a temporary Touch Point Cleaning service to courthouses, in response to the pandemic and the need to maintain hygienic touch points around the buildings
  • Procure Plus are a value focused, not for profit company that specialises in the procurement of goods and services related to both the new build, repair, and maintenance of social housing. Originally focussed in the North West, Procure Plus are now extending their offer with the aim of delivering a service across the UK. Procure Plus wishes to procure and enter into a framework agreement for the supply and installation of low and zero-carbon technologies.
  • Rochdale Borough Council (RBC) on behalf of Rochdale Development Agency (RDA) are tendering for a Contractor who is required to carry out the design, engineering, procurement, construction, testing, commissioning and handover of the Chamber House Solar Farm (the Solar Farm, or Project) and then operate and maintain the system until Completion. This project forms part of the wider Unlocking Clean Energy in Greater Manchester (UCEGM) European Regional Development Funded (ERDF) project and as such is part grant funded by ERDF The Solar Farm shall have a 30-year design life and shall generate and export power to the Point of Supply (PoS) defined in the grid connection offer provided by Electricity North West (ENW, or the Distribution Network Operator (DNO)).
  • Monitoring of water quality in systems across the Borough in line with Regulations.The initial contract term will be for 3 years with an option to extend for one further period of 2 years (3+2) for a potential total contract term of 5 years as stated in the ITT documents. Estimated contract spend is up to £80,000.00 per annum, £240,000 across the initial 3 year contract term and up to £400,000.00 across the potential total 5 year contract term.
  • Fusion21 has developed a framework for the full provision of workplace and facilities services across public sector estates. The framework is split into six (6) lots. Value excluding VAT: 1 100 000 000.00 GBP
  • South Tyneside Council wishes to install a district heating system serving several Council owned buildings in central Hebburn utilising the disused mine workings under Hebburn as a heat source. The installation of such a district heating scheme will reduce the Council’s reliance on gas to provide heating and significantly contribute to the Council’s commitment to its Carbon Reduction targets, and this scheme alone will provide a saving of 319 tonnes/year saving. A separate contract has been awarded to undertake the drilling of two boreholes, and the construction of permanent abstraction and re-injection wells. The water source heat pump adopted in this project will be able to source heat from both the mine water as well as ambient air (via dry air cooler) in the event that the mines are found to be unable to provide a sustainable mine water heat source.
  • Building construction work, Construction work for houses, Construction work for commercial buildings, Land sale or purchase services, Land management services, Architectural design services, Architectural, engineering and planning services
  • A contract is required for asbestos surveying to domestic properties and asbestos air monitoring, sampling and surveying to non-domestic properties to Council owned properties throughout the North Lanarkshire Council area.
  • Project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project.
  • A development agreement (“DA”) was originally entered into in 2010 between the South East England Development Agency (“SEEDA”) and Stanhope PLC and concerned the re-development, in phases, of a site in the centre of Ashford known as Elwick Place according to a masterplan to be agreed between the parties. In 2015 the Council acquired the site and the rights and obligations formerly vested in SEEDA under the DA. The Phases are now as follows: Phase 1 (cinema, hotel, restaurants, retail units and car park), Phase 2 (200 residential flats) and Phase 3 (yet to be agreed). The parties have now agreed certain changes to the DA.
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif