London PropTech Show 2026
London Build 2026

Search results for Cadent Gas Limited

Search results in Tenders

  • Receive, recycle and dispose of Segregated Inert Materials that will be delivered to site by the Council and/or collected by the Contractor
  • The design, installation and commissioning of a 3MW ground mounted solar farm at Newcastle International Airport
  • To provide Cleaning Services: Building Exterior, General, Deep, Specialist, Windows Internal & External
  • Dynamic Purchasing System (DPS) for the provision of Adaptations, Repair, Maintenance and Improvement (ARMI) for Contracting Authorities and grant applicants.
  • ASRA is seeking to appoint a suitably qualified and experienced contractor to enter into a JCT 2016 Design and Build Contract with Quantities with bespoke amendments to undertake the redevelopment of a residential housing project for the redevelopment of 71-75 Westmead Road, comprising a four storey development consisting of 35 apartments.
  • Provision of uniformed and trained, unarmed, security guard services to perform routine protective and access control duties for the Delegation of the EU in the United Kingdom located in London.
  • The Integrator service will include strategic property support through the development and implementation of processes and procedures and the management of property related services supply chains.
  • Supply of New Blinds and Spares. Repair and Alterations to existing Blinds
  • We are seeking a suitably experienced Supplier who has current experience of working within the dynamic environment, ideally with a strong operational base within the West Midlands, thus allowing for both adequate contract support and operational flexibility that is to be delivered to support the contract as and when needed moving forwards into this contract term.
  • Smoke Detector Installations/ Upgrades in Domestic Properties Framework in accordance with the requirements detailed in this contract notice and attached documents. It is envisaged that a maximum number of 4Nr Contractors will be awarded a place on the Ranked Framework.
  • The purpose of this tender process is to select two Service Providers - One for Asbestos Surveying and Legionella Risk Assessment services, and another to provide Asbestos Removal Services
  • This framework agreement is for the manufacture and supply of pipe spools. The framework will be for a maximum period of 48 months and act as an overflow to Framework Agreement FMPG/2020/004, to reduce the risk of any unforseen capacity.
  • Buckinghamshire Council (the Authority) invites Tenders for the provision of dry recycling services, which include hauling, sorting and reprocessing of recyclables. The contract term is 3 years from 10 May 2021 to 9 May 2024 with the option to extend for up to a further 3 years to 9 May 2027.
  • NHS Greater Glasgow and Clyde (GG&C) (“the participating authority”) require suitably qualified, competent and experienced Consultants to provide a range of Asbestos Surveying and Analytical Services through a framework agreement.
  • The Council's aim is to ensure that present and future residents of the Borough have greater choice in being able to live in a home that is affordable, in good condition and adequately meets their needs. The Council is keen to ensure that it has excellent future proof services, where possible, which meet these needs.
  • Following a procurement exercises Hackney Council has awarded a contract for the provision of Highways Maintenance, covering improvement of footways, carriageways, street lighting and other associated highways maintenance works. These works will enable the successful delivery of the capital improvement programme, reactive maintenance works and other associated works, carried out under a Measured Term Contract.
  • Project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project.
  • The framework agreement covers the provision of comprehensive and innovative waste solutions and suppliers will be expected to proactively assist in attempts to reduce the quantities of waste sent to landfill and achieve recycling targets. This is in line with the revised Waste (England and Wales) Regulations 2011 that prioritise the waste hierarchy.
  • Fusion21 has developed a framework for the full provision of workplace and facilities services across public sector estates. The framework is split into six (6) lots. Value excluding VAT: 1 100 000 000.00 GBP
  • Repair and maintenance services of building installations
/images/banners/4. ConstructionArea MPU (Mic2) (1).gif