Mechanical Sweeper, Road Sweeper Hire, Bond Coat Spraying, Joint Sealant Services, Road Marking Services
Deko Construction Decoration

Search results for heating materials

Search results in Tenders

  • This framework agreement is for the manufacture and supply of pipe spools. The framework will be for a maximum period of 48 months and act as an overflow to Framework Agreement FMPG/2020/004, to reduce the risk of any unforseen capacity.
  • The Council wishes to establish a Contract for the demolition of the houses located off Wellhead Lane followed by the remediation of the site. The works comprise general site clearance, removal of asbestos containing materials and demolition of the houses located off Wellhead Lane in Perry Barr, Birmingham.
  • Framework for Northern Saints Trails Improvement Works Please download documents from the NEPO portal using reference number DN497080.
  • Maintenance Tender including Responsive Repairs & Voids, 3 Star Gas Servicing and Electrical Testing 2021-2024
  • With co-funding from the European Regional Development Fund, the University of Sheffield has established a flagship national Translation Energy Research Centre (TERC) – a multi-technology, integrated platform for research, development and innovation at pilot-scale, to understand and demonstrate green energy solutions for a secure, affordable and sustainable energy system. It is one of the largest and best-equipped research and development facilities in Europe for zero-carbon energy, hydrogen, bioenergy, CCUS and combustion. We aim to procure a hydrogen fuel cell tests station. It will be used to investigate the impact of the operating conditions (i.e. the temperature, pressure, gas composition and humidity) on single fuel cell or small fuel cell stacks. It will be also used to investigate the effect of the new materials and/or designs on the fuel cell performance.
  • Luton Borough Council’s (LBC) Building and Technical Services Division (BTS) is seeking a supplier to provide Window frames and triple glazed units to supply its programmed works window replacement contract, with possible opportunities to supply windows for the new build contract.
  • Hand cleaner, Cleaning, polishing products, Brooms, brushes, household cleaning, Cleaning compounds, Cleaning cloths, Toilet cleaners, Hand sanitizer, Buckets, Detergents, Polythene waste, refuse sacks, bags
  • The works comprise stair and communal cleaning works to various housing schemes in Fife, Perth and Kinross and Falkirk areas.
  • Contract for Supply of Prefabricated Buildings at Levenmouth. Lot 2 Prefabricated Buildings.
  • Tenders are invited for inclusion on the framework for provision of Rolled Asphalt, Asphalt Concrete (Coated Macadam) and Coated Chippings in accordance with BS EN 13108; PD 6691: 2007 and BS 594987:2015. The successful Suppliers awarded a position on the framework will be responsible for providing the service.
  • Receive, recycle and dispose of Segregated Inert Materials that will be delivered to site by the Council and/or collected by the Contractor
  • The scope of this requirement is for the provision of preventative and corrective maintenance services and materials, including overhaul services, for three (3) Siemens SGT-200 Gas Turbines or equivalent and ancillary equipment, located at GNI(UK) Compressor Station at Brighouse Bay (Kirkcudbright), in southwest Scotland.
  • The scope of works will entail building new stabling roads. This will require additional track, new Switch and Crossings (S&C) units, platforms, walkways, lighting, communications and signalling.
  • The purpose of this Notice is to inform the market of the additional works/services to be performed by UBB Waste (Essex) Limited following a proposed amendment of its contract with ECC for the design, construction, commissioning, operation and handback of a mechanical biological treatment facility in Basildon. The facility did not pass the acceptance tests specified in the contract which led to ECC commencing litigation against the contractor. The Authority has given notice that it is proposing to take a decision to enter into an Agreement to settle that litigation and to amend the handback requirements of the contract such that the site will be returned to ECC in a condition that will allow for its future redevelopment. It is expected that the modified contract will expire in 2040.
  • The framework agreement covers the provision of comprehensive and innovative waste solutions and suppliers will be expected to proactively assist in attempts to reduce the quantities of waste sent to landfill and achieve recycling targets. This is in line with the revised Waste (England and Wales) Regulations 2011 that prioritise the waste hierarchy.
/images/banners/proptech_show_250_250.jpg