Waterproofing Solutions
BuildTech Week 2027

Search results for commercial construction

Search results in Tenders

  • Keynvor Morlift Ltd (KML) invites all suitable companies to tender for a call off contract for the supply of Construction workers for their Falmouth Wharves Marine Hub Project. The role of the supplier under this contract will be to provide workers across the construction trades to support the refurbishment and repair works on site. These works will include the renovation of commercial buildings, improvements to the site's external spaces and repairs to the piled wharf structure. You will be required to supply multi skilled workers with experience of working on commercial construction projects. They will be required to have relevant construction site qualifications, trades certificates and where necessary
  • A service to be provided by the contractor to manage the collection and disposal of portable and non-portable batteries within Great Britain excluding Northern Ireland. The estimated amount of batteries for collection is 16 000 tonnes per annum, this figure is for guidance only. There is also a requirement for the contractor to provide suitable containers/packaging for the removal of batteries. This Contract will have a duration of 7 years.
  • Building construction work, Construction work for houses, Construction work for commercial buildings, Land sale or purchase services, Land management services, Architectural design services, Architectural, engineering and planning services
  • Supply of loggers for - Permanent pressure logging – Supply interruption, PRV flow and pressure monitoring (not control), DMA meter – flow and pressure monitor, Incident management logging (SI), Ad-hoc survey logging flow / pressure, PRV control system with CP logger, Surge transient logging, Commercial Loggers and Acoustic Loggers
  • Contract for Supply of Prefabricated Buildings at Levenmouth. Lot 2 Prefabricated Buildings.
  • Domestic asbestos consultants, Domestic asbestos removal and remediation, Commercial asbestos removal and remediation, Commercial asbestos consultants,Asbestos Consultants - Domestic & Commercial
  • The City of Edinburgh Council is seeking to appoint a suitably qualified Development Partner for the delivery of a major mixed use scheme on a 3-hectare site at Fountainbridge. The development requirements for the site comprise of at least 436 homes and a separate office building. The proposals also include retail and commercial space which could be used for a variety of purposes. It is expected that the Development Partner would construct approximately 177 affordable homes, with ground floor retail for the Council, while the office space, remaining residential units, and ground floor retail/commercial space would represent a development opportunity.
  • The contract covers all Fife Council’s public buildings including schools, halls, sports centres, older person’s homes, offices, sheltered housing complexes, social work services group homes and education services janitorial houses which are of a more domestic nature, plant and equipment consisting of but not limited to natural gas, LPG and oil- fired commercial boilers, water heaters, radiant tube heaters, warm air heaters
  • Workstream 1: Domestic asbestos consultants, Workstream 2: Commercial asbestos consultants, Workstream 3: Domestic asbestos removal and remediation, Workstream 4: Commercial asbestos removal and remediation
  • The Enabling Civils Works (Package 2) (ECW2) Contract is to carry out the enabling civils works for HS2 Phase 2a, consisting of the construction of a bridge and associated slip roads across the M6 motorway at Yarnfield Lane, Stone, Staffordshire, together with highways improvements to Yarnfield lane; and off-route road improvement schemes at 20 locations across the line of route that are intended to mitigate the effects of increased traffic numbers during the main HS2 construction works with associated survey works. The Contract included route wide engineering and environmental surveys to inform the design of the railway.
  • PA Housing are going to market for heating servicing, maintenance and installation contracts. The services will include the delivery of provision of a 3 star heating servicing, maintenance and installation service for domestic and a servicing and maintenance service for commercial systems to properties owned and managed by PA Housing.
  • NHS Greater Glasgow and Clyde (GG&C) (“the participating authority”) require suitably qualified, competent and experienced Consultants to provide a range of Asbestos Surveying and Analytical Services through a framework agreement.
  • This requirement is for fire services including fire risk assessments, fire equipment, servicing and maintenance.
  • The GP Contract requires that by 2022/23, Lloyd George notes will be digitised and patients will have access to their records. A Dynamic Purchasing System was established in 2020 to ensure that CCGs can award contracts to suitably qualified and experienced suppliers who can deliver against this requirement, whilst keeping the burden to practices to a minimum.
  • Provision of non-complex works at stations, remedial works to existing structures, major & complex works to stations and Infrastructure Owner works (structures, fencing, civil works and buildings and property) across the Wales and Borders rail infrastructure.
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of a Crown Wall approximately 630m long by 15m high (Varying heights) on top of an existing rouble mound breakwater.
  • The Association has identified or will identify potential development opportunities primarily in Ayrshire and Dumfries & Galloway, to be procured between 2019 and 2023. These developments could involve the construction of up to approximately 800 new residential properties and various commercial/ non-housing projects over the next 4 years
  • Flexible electricity import and export contract. Official name: South West Water Ltd
  • Construction of Aberdeen South Harbour has commenced. This procurement is for the construction of the South Breakwater and other ancillary works, inclusive of the recommissioning and operation of the existing on-site accropode manufacturing facility for the manufacture of the final accropodes required for the construction of the South Breakwater.Provision of Insitu concrete shall be free issue by the client.
  • Swansea University is looking to procure a development partner to carry out a further phase of expansion and development works on, or near to, its Bay Campus. The works will comprise the: - construction and delivery of between 20,000 and 30,000 square meters of academic development, and ancillary retail and support facilities located on the Bay Campus; - construction, maintenance and operation of a minimum of six hundred (600) (and a maximum of fifteen hundred (1500)) accommodation units either on, or near to, the Bay Campus; and - potential construction and delivery of additional ancillary student space, welfare facilities and place-making such as (but not limited to) sports or music facilities.
/images/banners/LB26Banner250x250px-optimize.gif